Villa Construction & Renovation in Dubai, Built the Right Way

Licensed villa construction, renovation and remodelling across Dubai — real drawings, transparent pricing, and a Dubai Municipality-compliant process from Al Warqa to Emirates Hills.

DM Licensed Contractor

DEWA & DDA Registered

Villa & Majlis Specialists

The Wrong Contractor Can Cost You Far More Than the Renovation

An unlicensed or uninsured contractor can look attractive on price until something goes wrong structurally, electrically, or with the permit paperwork, and you’re the one left holding the repair bill. We build around dimensioned drawings, developer NOC and Dubai Municipality approvals, and waterproofing sized for Dubai’s climate, not the minimum spec.

We Build From Real Drawings, Not Rendered Promises

  • No vague sales-meeting renders
  • No permit surprises mid-project

Every villa construction, majlis addition, and renovation starts with a dimensioned drawing and a written scope, so you know exactly what you’re paying for, in what order, and by when.

See How We Work

Licensed & Insured

Fixed-Price Contracts

On-Site Project Management

Dubai Municipality Approved

What We Actually Do

From new-build villas to majlis additions and full renovations, every project starts with a dimensioned drawing and a written scope, not a rendered promise.

Our Core Services

Villa Construction

Majlis Construction

Villa Renovation

Villa Remodelling

Home Renovation

Interior & Exterior Finishing

Why Homeowners Choose Al Mas Star

  • Dimensioned Drawings Before Contract
  • Developer NOC & DM Permits Handled
  • Licensed Engineer Sign-Off
  • Fixed Written Scope & Pricing
  • Climate-Rated Waterproofing
  • One Contact, Site Visit to Handover
Book a Free Site Visit
  • We got a real architectural drawing before signing, not a sales render. Al Mas Star’s team was on-site when they said they’d be, every time.
    Khalid M., Villa Owner, Business Bay

From Site Visit to Handover, Done Right

1. SITE VISIT & CONSULTATION

We walk the plot or existing villa with you and talk through what you actually want to achieve.

2. DESIGN & DRAWINGS

Dimensioned architectural drawings, not renders, with materials and finishes agreed in writing.

3. PERMITS, BUILD & HANDOVER

Developer NOC, DM/Trakhees permit and DEWA approvals handled for you, then construction, finishes and a final walkthrough before handover.

  • “Al Mas Star gave us real drawings before we signed anything, and every change was priced and agreed in writing. No surprises during construction.”
    Ahmed R., Villa Owner, Al Warqa
  • “They handled our developer NOC and DM permit before touching a wall, so there were zero surprises with authorities during our renovation.”
    Fatima K., Villa Owner, Muhaisnah
  • “Communication was clear from the first site visit to the final walkthrough. Al Mas Star’s team showed up when they said they would.”
    Kelly M., Villa Owner, Emirates Hills

Real Projects Across Dubai

Villa Extension, Al Warqa — majlis addition with structural tie-in

Frequently Asked Questions

Straight answers to the questions Dubai homeowners ask most before starting a villa project.

Call +971 55 594 4558

Book a Free Site Visit

Yes, for structural work such as removing load-bearing walls, adding extensions, or adding a floor. Purely cosmetic work like paint or flooring can qualify for Dubai Municipality’s instant Self-Decor approval. We confirm which category your project falls into during the first site visit, before any pricing is finalized.

A developer NOC, required in communities built by Emaar, Nakheel, DAMAC, or Dubai Properties, confirms your community’s developer approves the scope of work. A Dubai Municipality or Trakhees permit is the government approval required specifically for structural changes. Most renovation projects in developer communities need both, plus DEWA sign-off for any electrical or plumbing work.

A new-build villa typically runs 12 to 18 months from design through handover, including permit approval time. A villa renovation or remodel is usually faster, often 3 to 6 months depending on scope, but structural renovations still need 6 to 10 weeks of approvals before construction can begin.

Costs vary by finish level and location, generally running from around AED 450 per sq ft for a standard build up to AED 1,400+ per sq ft for a high-end custom villa. We provide a written, itemized quote after the initial site visit rather than a single number up front, because finishes, MEP scope, and site conditions genuinely change the total.

Yes. The UAE’s midday work rule limits outdoor labor hours during the hottest part of the day through peak summer, and concrete curing needs adjusted handling in high heat. It doesn’t stop a summer-started project, but it does affect pacing; we build that into the schedule we give you rather than promising a timeline the weather won’t allow.

A milestone-based structure tied to verified progress, for example a smaller amount on signing, then payments released as structural work, MEP, and finishing stages are each completed and inspected, protects you far better than a large deposit paid before work starts.

Ready to Start Your Villa Project?

Book a free, no-obligation site visit and we’ll walk your plot or existing villa with you, talk through what’s realistic for your budget and timeline, and follow up with a written scope, not a verbal promise.

Call, WhatsApp, or fill out the form below and we’ll follow up to schedule your free site visit.

Licensed villa construction, renovation and remodelling across Dubai.

Call us +971 55 594 4558

info@almasstarbuildingcontracting.com

Navigate

Areas We Serve

Serving Villa Communities Across Dubai

  • Al Warqa
  • Emirates Hills
  • Muhaisnah
  • Business Bay
  • Al Mizhar
  • Jumeirah

© 2026 Al Mas Star Building Contracting L.L.C. All rights reserved.